Shop Drawing Review: Who’s Responsible & What Gets Missed
You’ve probably run into this already: a shop drawing comes back approved, the fabricator builds to it, and then something doesn’t fit in the field. Everyone points at someone else. The architect says they only reviewed for design intent. The contractor says the drawing was stamped. The sub says they built exactly what was submitted. […]
Shop Drawing Review: Who’s Responsible & What Gets Missed Read More »
